Why the Price of a 5kg/Day Aqua Regia Gold Refining System Varies: CDOCAST vs. General Suppliers
How to Choose a 5kg/Day Aqua Regia Gold Refining System
A professional aqua regia refining system is not simply a dissolving tank and a fume tower. For daily gold refining, buyers need to compare reaction capacity, fume treatment, precipitation control, automation, anti-corrosion materials and the hidden installation items behind the quotation.

Buyer conclusion: when two suppliers both quote a “5kg/day aqua regia refining system”, the real difference usually appears in vessel size, fume handling capacity, automation level, material thickness and whether important workshop items are included. These details affect safety, gold recovery, output stability and long-term operating cost.
Start With the Reaction Capacity
The dissolving stage is the most sensitive part of aqua regia refining. Gold reacts with aqua regia while releasing heat and gas. If the reaction vessel is too small, the solution can foam, rise quickly or overflow.

50L Titanium Kettle
More reaction buffer for exothermic dissolution, acid foaming and gas release.

150L Reduction Bucket
Enough solution volume for dilution, chemical reduction and sponge gold precipitation.

Industrial Layout
The system should be planned as a refining line, not as a single tank purchase.
| Key Item | Common Entry-Level System | CDOCAST Configuration | Why It Matters |
|---|---|---|---|
| Dissolving Kettle | 30L titanium kettle | 50L double-layer titanium kettle | More safety buffer during high-activity aqua regia reaction. |
| Reduction Bucket | 50L PP bucket, often manual stirring | 150L PPH bucket with 0.14KW variable-frequency agitator | Larger volume and better mixing improve precipitation stability. |
Evaluate the Exhaust Gas Treatment System
Aqua regia refining produces nitrogen oxide fumes, especially during dissolution. A basic single spray tower may not be enough when the reaction reaches peak intensity.
| Exhaust Treatment Item | Common Basic System | CDOCAST Configuration | Benefit |
|---|---|---|---|
| Fume Surge Control | Single fan and spray tower | 7.5KW PPH vacuum pump unit + 800L treatment tank | Better handling of sudden NOx fume release. |
| Spray Tower | Smaller basic tower | Ø1200 × 3800mm vertical three-level spray tower | More treatment space and stronger absorption capacity. |
| Fan Material | PP fan | 4KW FRP centrifugal fan | Improved corrosion resistance for acid fume conditions. |
Check the Automation and Process Control
Refining quality depends on repeatable chemistry control. Manual pH adjustment, manual stirring and unstable temperature control may work for very small batches, but they are not suitable for stable daily production.
- Automatic pH dosing: a 300L medicine box and probes help reduce manual adjustment error.
- Variable-frequency mixing: controlled agitation supports more uniform reduction and precipitation.
- Heating and cooling: a -5 to 100°C thermostat helps control process temperature.
- Hot water washing: a 200L industrial boiling water machine helps remove chloride residues from sponge gold.
Do Not Ignore Hidden Installation Costs
Some quotations look cheaper because they do not include the items needed to build a practical acid refining room. These missing parts become extra cost after the equipment arrives.
| Hidden Item | Why Buyers Often Miss It | CDOCAST Approach |
|---|---|---|
| Anti-Corrosion Floor | Often not shown in machine-only quotations | 35m² of 10mm PP anti-corrosion flooring included |
| Tank Material | Thin PP sheets may look similar in photos | 15mm PPH tanks with extrusion and winding structure |
| Titanium Hardware | Small parts are easy to overlook | Titanium components used in critical corrosive areas |
How to Compare Two 5kg/Day Gold Refining Quotations
A low initial price is not always the lower total cost. For gold refining, downtime, gold loss, acid leakage, fume leakage, labor intensity and maintenance can cost more than the price difference.
Check dissolving kettle volume, reduction bucket volume and real batch workflow.
Look beyond the tower photo and check vacuum, tank volume, fan power and tower size.
Confirm pH dosing, mixing, temperature control and washing support.
Check titanium, PPH, FRP, tank thickness and corrosion-resistant fittings.
Confirm floor protection, water machine, medicine box and installation accessories.
Evaluate safety, operator workload, maintenance and gold recovery stability.
Final Buyer Checklist Before Ordering
Before confirming a 5kg/day aqua regia gold refining system, ask your supplier to clarify these details in writing.
| Checklist Item | What to Confirm |
|---|---|
| Raw Material | Gold scrap type, purity range, impurities and daily input quantity |
| Dissolution System | Kettle volume, material, heating method and overflow protection |
| Reduction System | Bucket volume, mixing method, pH control and precipitation workflow |
| Exhaust System | Vacuum pump, treatment tank, spray tower, fan material and tower size |
| Workshop Setup | Floor protection, drainage, ventilation, acid storage and operator protection |
| After-Sales Support | Installation guidance, chemical process support, spare parts and training |
Need a Safer 5kg/Day Gold Refining Line?
Send CDOCAST your raw material type, daily input quantity, target purity and workshop layout. Our engineer team can help recommend a practical aqua regia refining system with proper reaction capacity, exhaust treatment and anti-corrosion configuration.
Contact CDOCAST Engineer