Tube Necking Machine

Buy the Most advanced Tube Necking Machine

Tube-End Reduction · Drawing Preparation · D2 Tooling

Tube Necking Machine for Gold, Silver and Precious Metal Tube

CDOCAST CDO-TN1 reduces and tapers the end of Φ2–12 mm precious-metal tube. The formed lead end can enter a tube drawing die more easily, helping prepare gold, silver, copper and compatible alloy tubes for subsequent reduction and sizing.

CDOCAST CDO-TN1 tube necking machine for gold silver and copper tube ends
Φ2–12 mmPublished tube diameter range
≤50%Maximum published necking ratio
D2 HRC 60–62Necking die material and hardness
3 kWMain motor power

What Is a Tube Necking Machine?

A tube necking machine forms a reduced or tapered section at the end of a metal tube. For precious-metal tube production, this smaller lead end is especially useful before tube drawing: it gives the operator a section that can pass through the drawing die and be gripped for the next reduction.

The CDO-TN1 is a tube-end forming machine for gold, silver, copper and suitable alloy tube. With matching dies, it can serve as a gold tube necking machine, silver tube necking machine or copper tube end reducer. It uses a motor-driven forming head, a 100 mm D2 tool and an electric lubrication system. It does not replace a tube drawing machine; it prepares the tube end for drawing or another downstream operation.

  • For Φ2–12 mm tube according to the published specification.
  • Maximum necking ratio is listed as ≤50%.
  • Appropriate die geometry depends on tube diameter, wall thickness, alloy and required lead-end shape.
before and after copper tube end reduction using a tube necking machine
Example of reducing a tube end to create a smaller lead section for subsequent processing.

CDO-TN1 Precious Metal Tube Necking Machine

One compact model covers the published Φ2–12 mm working range with customized tooling selected from the tube specification.

CDO-TN1 compact tube diameter reducing machine on swivel casters

CDO-TN1 Tube End Reducing Machine

Designed to prepare tapered tube ends for drawing, sizing or other downstream operations without cutting away the tube end.

Working diameterΦ2–12 mm
Necking ratio≤50%
DieD2, HRC 60–62
Die length100 mm
Motor3 kW
Machine weight350 kg

Tube Necking Machine Parameters

The table follows the CDOCAST tube-forming catalog and the published CDO-TN1 product specification.

CDO-TN1 standard specification
SpecificationCDO-TN1
Voltage380 V, 3 phase, 50 Hz
Motor power3 kW
Maximum tube diameterΦ12 mm
Minimum tube diameterΦ2 mm
Maximum necking ratio≤50%
Die material and hardnessD2, HRC 60–62
Die length100 mm
Lubrication systemThree-phase electric pump
Machine size (L×W×H)730×480×1050 mm
Machine weight350 kg

Tube-End Necking Process

Correct tooling and lubrication are essential when reducing thin-wall gold, silver or copper tube.

Inspect the Tube

Confirm outside diameter, wall thickness, seam condition, straightness and whether the material requires annealing.

Select and Lubricate the Die

Match the D2 necking tool to the incoming tube and required lead-end diameter, length and taper.

Form the Tube End

Insert the specified length into the forming head and reduce the end progressively without exceeding the approved reduction.

Measure Before Drawing

Check the neck diameter, taper length, concentricity and surface before feeding the tube into the drawing die.

Machine Structure and Operating Points

The compact layout keeps the working head, controls and lubrication connection accessible to the operator.

tube necking machine inlet lubrication pipe start emergency stop and swivel casters
Metal Tube InletThe tube end enters the forming head along the machine axis. Tube straightness and correct insertion length affect the finished lead end.
Electric Lubrication SystemThe published specification lists a three-phase electric pump to supply lubrication to the necking operation.
Start and Emergency StopControls are positioned beside the working head for normal operation and immediate stopping.
Mobile Cabinet StructureSwivel casters support workshop positioning while the enclosed base protects the drive and service components.

Gold, Silver and Copper Tube Applications

Final die selection should follow the actual alloy, wall thickness and drawing schedule rather than material name alone.

gold silver and copper tubes for precious metal tube necking

Precious Metal and Copper Tube

Supports tube-end preparation for gold, K-gold, silver, copper and compatible alloys within the specified diameter range.

multiple views of compact precious metal tube necking equipment

Tube Drawing Lead-End Preparation

Creates a reduced tube end that can enter a smaller drawing die and provide a gripping section for downstream reduction.

Information Needed for a Tube Necking Machine Quotation

Send both incoming and required neck dimensions so the tooling can be evaluated correctly.

Tube MaterialState gold, K-gold, silver, copper, brass or another alloy, including temper or annealed condition when available.
Incoming Tube DimensionsProvide outside diameter, inside diameter or wall thickness, tube length and dimensional tolerance.
Required Neck GeometrySpecify final neck diameter, neck length, taper angle or profile and allowable concentricity.
Reduction ScheduleState whether the full reduction is expected in one operation or progressive steps and confirm it remains within the machine limit.
Downstream Drawing DieProvide the drawing-die entrance size and gripping requirement so the lead end can be matched to the next process.
Production RequirementInclude pieces per shift, typical batch size, available voltage and whether additional dies are required.

Related Precious Metal Tube Equipment

Necking is normally positioned between initial tube forming and subsequent tube drawing or annealing.

Download the Metal Forming Machine Catalog

Review the tube-forming series, then send the incoming tube and required neck dimensions for tooling selection.

Download Catalog

Tube Necking Machine FAQ

Purchasing answers for jewelry and precious-metal tube manufacturers.

What is the main purpose of a tube necking machine?

It reduces or tapers the tube end. In precious-metal tube production, the smaller lead end helps the tube enter a drawing die and gives the operator a section that can be gripped for the next reduction.

What tube diameters can CDO-TN1 process?

The published specification lists a working range from Φ2 mm to Φ12 mm. Tooling must still be matched to the exact outside diameter, wall thickness and required neck profile.

What is the maximum necking ratio?

The catalog lists a maximum necking ratio of ≤50%. The practical reduction for a specific tube depends on alloy ductility, wall thickness, seam condition, annealing state and die geometry.

Can the machine neck gold, silver and copper tube?

Yes, these are the primary published applications. Provide the alloy and temper because fine gold, K-gold, silver and copper do not behave identically during tube-end reduction.

Is tube necking the same as tube drawing?

No. Necking prepares a reduced section at the tube end. Tube drawing pulls the tube through a die to reduce and size a longer section or the entire tube.

Is a tube necking machine the same as a tube swaging machine?

The terms can overlap in some markets, but the required operation should be defined clearly. CDO-TN1 is presented here for tapered tube-end reduction and drawing-die preparation; buyers needing full-length rotary swaging should provide a separate process drawing.

What information is required for a tube necking machine price?

Provide the material, incoming outside diameter and wall thickness, final neck diameter and length, taper profile, tube length, production quantity, downstream drawing-die size and factory voltage.

Need a Tube-End Forming Solution for Precious Metal?

Send CDOCAST your tube drawing, alloy, wall thickness and required neck profile for CDO-TN1 tooling evaluation.

Request a CDO-TN1 Quotation